MODULAR AI INFRASTRUCTURE

Deploy compute
where it matters.

DracoEdge brings enclosures, racks, power, cooling, GPU nodes and orchestration together in compute infrastructure designed for engineering review, manufacturing and expansion.

20 / 40 ftPlanned enclosure sizes
Factory pre-integrationDelivery subject to design validation
Hardware + platformPhase 1–2 catalog
01Integrated system designRacks, power distribution, cooling, fire protection and monitoring designed within one engineering scope
02Coordinated power and coolingHot/cold aisles, power and cooling validated against the load and site configuration
03Clearer site integrationMounting, utilities, networking and commissioning interfaces defined in the delivery package
04Expandable remote operationsProbe, platform and multi-enclosure management integrated as project conditions allow

DRACOEDGE / PRODUCT RANGE

Ling Shu Pod / Qianlong Ark product range

Two series, air cooling and cold-plate liquid cooling, in standard 20HQ and 40HQ high-cube sizes.

Built on standard 20HQ and 40HQ shipping formats, with racks, power and UPS, cooling, fire protection, cabling, security and facility monitoring integrated in the factory.

Ling Shu 200

Ling Shu 200

DracoPod™ 200 AI Compute Pod

DE-Pod-200

20HQAir-cooledChina deliveryInternational delivery

20-foot precision air cooling for edge nodes, mid-size inference and standalone sites.

Rack positions
6
IT power per rack
15–25 kW
Pod IT load
65–100 kW
Explore product systems
Ling Shu 400

Ling Shu 400

DracoPod™ 400 AI Compute Pod

DE-Pod-400

40HQAir-cooledChina deliveryInternational delivery

40-foot precision air cooling with two rack rows for regional computing and phased expansion.

Rack positions
14 (7+7)
IT power per rack
20–25 kW
Pod IT load
160–195 kW
Explore product systems
Qianlong 200

Qianlong 200

DracoArk™ 200 Liquid AI Ark

DE-Ark-200

20HQLiquid-cooledChina deliveryInternational delivery

20-foot cold-plate cooling with CDU and auxiliary air cooling for dense deployments with limited space.

Rack positions
6
IT power per rack
50–80+ kW
Pod IT load
200–300 kW
Explore product systems
Qianlong 400

Qianlong 400

DracoArk™ 400 Liquid AI Ark

DE-Ark-400

40HQLiquid-cooledChina deliveryInternational delivery

40-foot cold-plate cooling with cooling equipment at both ends for larger GPU clusters and multi-pod expansion.

Rack positions
14 (7+7)
IT power per rack
50–90+ kW
Pod IT load
400–720 kW
Explore product systems

Series configuration ranges. Rack positions include space for power and auxiliary equipment. IT rack counts, loads and interfaces are agreed per project.

DracoEdge pioneered in-pod server installation

Longji moves racks to open a work aisle. The 500 kg rated Tiansuo overhead system assists with moving, lifting and aligning heavy servers. Xuanjia protects the enclosure, and optional Poxiao powers lighting and installation equipment before grid connection.

Xuanjia · Longji · Tiansuo · Poxiao

Ling Shu 400 · Pod cutaway

DE-Pod-400

DracoPod™ · Air-cooled

40-foot precision air cooling with two rack rows for regional computing and phased expansion.

Nominal 40HQ steel enclosure
12,192 × 2,438 × 2,896 mm
Nominal single-rack dimensions
600 × 1,200 × 2,000 mm

Dimensions are nominal or design values; transport clearances, equipment compatibility and final configurations are project-specific.

CONFIGURATION LOGIC

Match your site and load
with the right enclosure.

ProductsSizeCoolingTypical application
Ling Shu 20020HQAir-cooled20-foot precision air cooling for edge nodes, mid-size inference and standalone sites.
Ling Shu 40040HQAir-cooled40-foot precision air cooling with two rack rows for regional computing and phased expansion.
Qianlong 20020HQLiquid-cooled20-foot cold-plate cooling with CDU and auxiliary air cooling for dense deployments with limited space.
Qianlong 40040HQLiquid-cooled40-foot cold-plate cooling with cooling equipment at both ends for larger GPU clusters and multi-pod expansion.

WHY DRACOEDGE

Better equipment design
starts with site realities.

Ling Shu 400
ADVANTAGE / 01 · DESIGN DIRECTION

A complex system, one delivery unit

Enclosures, racks, servers, storage, power distribution, cooling, fire protection interfaces and infrastructure monitoring share one engineering scope, reducing on-site interfaces and coordination across suppliers.

Explore enclosure products →
02

Engineered airflow

Hot/cold aisles and intake/exhaust paths guide the design, with air cooling, rear-door heat exchangers or liquid cooling selected for the intended density.

↗
03

Defined fault boundaries

Power distribution, UPS, cooling, access control, leak detection, smoke detection and equipment status follow a defined monitoring point list, with clear responsibility boundaries between alarms and local interlocks.

↗
04

Repeatable expansion

20 ft and 40 ft enclosures are planned for different deployment schedules, with additional units integrated as demand grows.

↗
05

Operational visibility

Shared device identity, telemetry, task, metering and audit fields from Probe to Center provide interfaces for future unified operations.

↗

ENGINEERED FOR DELIVERY

Better equipment is more than specs.
It means less uncertainty at delivery.

The value lies in a clear scope: structure, racks, power, cooling, fire protection, monitoring and software interfaces can each be accepted separately, then linked through a shared monitoring point list and device identity. This is designed to reduce site rework and redesign during expansion.

Less work on siteLess assembly, coordination and last-minute rewiring
More operational visibilityPower, temperature, tasks and alerts in one view
Repeatable scalingAdd enclosures and nodes within the agreed contract scope
Assess your deployment ↗
Conceptual hot and cold airflow paths in the DracoPod™ design render

A verifiable path from design to handover

  1. Site and requirements

    Confirm site conditions, deployment goals, rack power, network and operating boundaries.

  2. Solution and configuration

    Define the equipment list for 20HQ or 40HQ, air or liquid cooling, and project needs.

  3. Factory integration and acceptance

    Integrate power, cooling, monitoring and interfaces; record agreed test results.

  4. Deployment and handover

    Deliver against the agreed transport, installation, connection and training plan.

Prototype validationTest recordsOperations SOPs

PLATFORM LAYERS

From deployment to operations

Deploy compute pods

Choose DracoPod air cooling or DracoArk liquid cooling in 20- or 40-foot formats according to site, rack power and cooling needs.

Monitor equipment

Connect power, cooling and environmental monitoring to view status and alerts in one place. Integration depends on the project.

Manage compute across sites

For multi-site deployments, discuss unified management and workload scheduling. Scope is agreed per project.

Node-side software

Draco-Probe

Planned for device identity, resource and environmental telemetry, task execution, logs, offline buffering and fault isolation. Protocols, monitoring points and writable actions require confirmation through equipment supplier responses.

TelemetryOffline bufferingProtocol integration
Node-side software

PRODUCT CATALOG

Tangible hardware.
A connected platform.

DEPLOYMENT SCENARIOS

Bring compute closer
to where work happens.

These are potential applications, not completed customer deployments. Implementation depends on data, networking, site conditions, model licensing and customer acceptance requirements.

COMPANY QUALIFICATIONS

Company credentials and management systems

Longyu Zhishuan's own credentials and partner capabilities are presented separately, with ownership stated for each credential, result and reference.

Longyu Zhishuan · Own credentials and results

ENGINEERING & SAFETY

Engineering and workplace safety

  • Work safety license Listed in company materials as valid through 2029-07-14
  • General contracting for building construction Listed in company materials as valid through 2029-01-09
  • Specialist contracting for building electromechanical installation Listed in company materials as valid through 2029-01-09
  • Specialist contracting for environmental engineering Listed in company materials as valid through 2029-01-09
  • Construction labor qualification Listed in company materials as valid through 2028-09-06
MANAGEMENT SYSTEMS

Quality, environmental and occupational health and safety

  • ISO 9001:2015 Quality management system · listed as valid through 2028-12-17
  • ISO 14001:2015 Environmental management system · listed as valid through 2028-12-17
  • ISO 45001:2018 Occupational health and safety management system · listed as valid through 2028-12-17
INNOVATION & BRAND

Innovation recognition and brand portfolio

  • High and new technology enterprise Enterprise recognition
  • Integration of informatization and industrialization assessment Informatization and industrialization integration
  • Registered trademark classes Classes 35, 37, 11 and 1

The Longyu Zhishuan section is based on pages 24–27 of the company materials and is for general information. Certificate names, grades, scope and current validity are subject to the official certificates and competent authorities' public records.

STRATEGIC PARTNER · KEHUA DATA (002335)

Kehua Data · Strategic partner

Longyu Zhishuan has established a strategic relationship with Kehua Data. According to the materials, Kehua is the exclusive supplier of core power electronics and key infrastructure equipment for the compute pods; the companies collaborate on power, engineering integration and validation.

Exclusive supply arrangement · per materials
1988 Predecessor founded in Zhangzhou
002335 Listed in Shenzhen in 2010
6 Global manufacturing bases
Xiamen · Zhangzhou · Malaysia Locations named in the materials
RECOGNITION & AWARDS

Enterprise recognition and awards

National high-tech enterprise; nationally recognized enterprise technology center; national industrial design center National green factory; postdoctoral research workstation National intelligent manufacturing exemplary scenario; manufacturing single-champion product (UPS) National innovation demonstration enterprise; service-oriented manufacturing demonstration enterprise; smart-PV pilot enterprise Green-design demonstration enterprise; key high-tech enterprise under the Torch Program Fujian Government Quality Award; Fujian smart-manufacturing pilot enterprise 2020 Second Prize, State Science and Technology Progress Award: key technologies and equipment for high-overload island/coastal power systems 2020 First Prize, Fujian Science and Technology Progress Award: operation control for large-scale battery storage First Prize for Technological Invention, Ministry of Education; provincial science awards; China Power Supply Society awards, among others

PROGRAMS & GREEN CATALOGS

Technology programs, awards and green standards

Science and technology programs: 10 key new products · 20 Torch Program projects · 2 national high-tech industry projects · 2 central-guided local projects Patent awards: 2 China Patent Awards · 3 Fujian Patent Awards · 7 municipal awards · 26 other provincial or ministerial science awards Green systems and catalogs: ISO 14001 · Green Star product certificate · green data-center technology catalog · telecom energy-saving catalog · RoHS / WEEE Industry and enterprise credentials: national and industry recognitions; see official company materials and certificates.

TEST & VALIDATION

R&D and validation facilities

11 environmental test platforms: temperature, humidity, salt spray, high altitude, dust and water exposure. 10-meter electromagnetic compatibility facility: conducted and radiated emissions and immunity testing. Reliability testing: service-life aging, vibration and drop tests.

These facilities are described in the product materials; they do not mean every project has completed every test.

R&D DIRECTIONS

AI infrastructure R&D directions

Power architecture: research into high-voltage DC isolation, solid-state transformers and next-generation data-center power. Cold-plate liquid cooling: pump optimization and coolant-temperature control for high-density cooling. Power-system integration: prefabricated power distribution and DC systems adapted to changing compute loads. Heterogeneous compute scheduling: a unified scheduler with domestic chip vendors to scale mixed-chip clusters on demand.

These are R&D directions in the materials, not claims of standard product availability.

SELECTED PROJECT REFERENCES

Project references listed by Kehua Data

The following projects and roles are listed in Kehua Data materials as examples of its industry experience. They are not Longyu Zhishuan delivery references or commitments from this site.

Data-center projects

ICBC headquarters (Xisanqi): high-voltage DC power modules. China Mobile Nanjing Jiangbei: data-center project. Tencent Huailai Ruibei: prefabricated Block data-center solution. ABC headquarters: modular data center and rail-mounted robotic inspection. China Telecom Nanjing (Jishan): cloud computing center. Tencent Mini-Tblock: prefabricated container data center with high-voltage DC.

Financial-sector data centers

Agricultural Bank of China Inner Mongolia data center: phase one is approximately 120,000 m², including about 30,000 m² of data halls across six buildings; materials say Kehua contributed factory-prefabricated room systems. Everbright Securities technology operations disaster-recovery center: integrated power, cooling, micro-modules and facility monitoring.

Critical infrastructure and public venues

Beijing Daxing International Airport: airport power assurance. Hong Kong–Zhuhai–Macau Bridge: power for critical bridge equipment. China–Brunei flagship cooperation project: energy infrastructure. Guangxi Fangchenggang Nuclear Power Station: nuclear-grade UPS. BRICS Xiamen Summit: power assurance for a major international event. Hangzhou 2022 Asian Games: micro-module data center; the source image shows the event emblem.

Energy-storage projects

Grid-side storage test and demonstration project. China Resources Liyujiang: generation-side peak-shaving storage. Distributed grid-side energy storage. Taizhou, Jiangsu: user-side storage. Lingbi, Anhui: wind-farm paired storage. North American outdoor energy-storage converter.

This partner section is based on pages 28–39 of the product materials. Kehua Data (002335) credentials, awards, R&D directions and project references shown here are not Longyu Zhishuan credentials or delivery references. Names, figures, scope of participation and publication authorization must be confirmed against Kehua Data's current official materials and approval.

START A CONVERSATION

Turn your deployment requirements
into a practical plan.

Tell us your site, compute scale and delivery goals. Our team can help you choose between DracoPod air cooling and DracoArk liquid cooling, and assess platform integration.

Enclosure selection Use-case assessment Platform integration

Your requirements will be saved in our website system for the project team to follow up. Do not include passwords or other sensitive information.