
Ling Shu 200
DracoPod™ 200 AI Compute Pod
DE-Pod-200
20-foot precision air cooling for edge nodes, mid-size inference and standalone sites.
- Rack positions
- 6
- IT power per rack
- 15–25 kW
- Pod IT load
- 65–100 kW
MODULAR AI INFRASTRUCTURE
DracoEdge brings enclosures, racks, power, cooling, GPU nodes and orchestration together in compute infrastructure designed for engineering review, manufacturing and expansion.
DRACOEDGE / PRODUCT RANGE
Two series, air cooling and cold-plate liquid cooling, in standard 20HQ and 40HQ high-cube sizes.
Built on standard 20HQ and 40HQ shipping formats, with racks, power and UPS, cooling, fire protection, cabling, security and facility monitoring integrated in the factory.

DracoPod™ 200 AI Compute Pod
DE-Pod-200
20-foot precision air cooling for edge nodes, mid-size inference and standalone sites.

DracoPod™ 400 AI Compute Pod
DE-Pod-400
40-foot precision air cooling with two rack rows for regional computing and phased expansion.

DracoArk™ 200 Liquid AI Ark
DE-Ark-200
20-foot cold-plate cooling with CDU and auxiliary air cooling for dense deployments with limited space.

DracoArk™ 400 Liquid AI Ark
DE-Ark-400
40-foot cold-plate cooling with cooling equipment at both ends for larger GPU clusters and multi-pod expansion.
Series configuration ranges. Rack positions include space for power and auxiliary equipment. IT rack counts, loads and interfaces are agreed per project.
Longji moves racks to open a work aisle. The 500 kg rated Tiansuo overhead system assists with moving, lifting and aligning heavy servers. Xuanjia protects the enclosure, and optional Poxiao powers lighting and installation equipment before grid connection.
Xuanjia · Longji · Tiansuo · Poxiao

DE-Pod-400
40-foot precision air cooling with two rack rows for regional computing and phased expansion.
20-foot precision air cooling for edge nodes, mid-size inference and standalone sites.
DE-Pod-400
Built for the elements. Stacks three high.
Xuanjia combines a standard high-cube enclosure, marine-grade corrosion protection and three structural load classes.
Standard 20HQ and 40HQ shipping formats.
Stacking options use load classes that decrease by level; approved position and top-load limits are marked.
Enclosure protection and sealing are configured for the intended outdoor conditions.
DE-Pod-400
Move one rack. Make room to work.
Longji moves IT racks independently or together while equipment with fixed connections stays in place.
Independent or coordinated rack movement, depending on the configuration.
In-row cooling, power distribution and UPS units stay fixed to protect connections.
Moving racks against the wall opens a front aisle. Returning them restores rear access.
Universal mounting holes and separate transport and operating locks.
DE-Pod-400
Lift overhead, load directly into the rack.
Tiansuo uses a compact overhead electric crane to move heavy servers from the door to the rack.
Rated for 500 kg, for handling servers of about 100–200 kg.
Lift from floor level at the door, move through the aisle and align with the rack.
Crane, rack rails and cable trays are arranged to fit the selected internal layout.
Future options include a rail extension beyond the door and positioning by rack and U location.
DE-Pod-400
Power up for installation before grid connection.
Poxiao pairs optional off-grid solar with smart lighting so installation can proceed while utility connections are being built.
Roof mounting provisions retain the standard transport envelope. Compact storage can buffer auxiliary power.
High color rendering, flicker-free lighting covers rails, cables and maintenance surfaces.
Supports access control, fire systems, lighting, rack rails and installation aids. Server IT loads use the main supply.
Automatically hands over to utility or diesel power, then switches to standby and recharging.
DE-Pod-200 · DE-Pod-400
40-foot precision air cooling with two rack rows for regional computing and phased expansion.
20-foot precision air cooling for edge nodes, mid-size inference and standalone sites.
DE-Ark-200 · DE-Ark-400
40-foot cold-plate cooling with cooling equipment at both ends for larger GPU clusters and multi-pod expansion.
20-foot cold-plate cooling with CDU and auxiliary air cooling for dense deployments with limited space.
Dimensions are nominal or design values; transport clearances, equipment compatibility and final configurations are project-specific.
CONFIGURATION LOGIC
| Products | Size | Cooling | Typical application |
|---|---|---|---|
| Ling Shu 200 | 20HQ | Air-cooled | 20-foot precision air cooling for edge nodes, mid-size inference and standalone sites. |
| Ling Shu 400 | 40HQ | Air-cooled | 40-foot precision air cooling with two rack rows for regional computing and phased expansion. |
| Qianlong 200 | 20HQ | Liquid-cooled | 20-foot cold-plate cooling with CDU and auxiliary air cooling for dense deployments with limited space. |
| Qianlong 400 | 40HQ | Liquid-cooled | 40-foot cold-plate cooling with cooling equipment at both ends for larger GPU clusters and multi-pod expansion. |
WHY DRACOEDGE

Enclosures, racks, servers, storage, power distribution, cooling, fire protection interfaces and infrastructure monitoring share one engineering scope, reducing on-site interfaces and coordination across suppliers.
Explore enclosure products →Hot/cold aisles and intake/exhaust paths guide the design, with air cooling, rear-door heat exchangers or liquid cooling selected for the intended density.
Power distribution, UPS, cooling, access control, leak detection, smoke detection and equipment status follow a defined monitoring point list, with clear responsibility boundaries between alarms and local interlocks.
20 ft and 40 ft enclosures are planned for different deployment schedules, with additional units integrated as demand grows.
Shared device identity, telemetry, task, metering and audit fields from Probe to Center provide interfaces for future unified operations.
ENGINEERED FOR DELIVERY
The value lies in a clear scope: structure, racks, power, cooling, fire protection, monitoring and software interfaces can each be accepted separately, then linked through a shared monitoring point list and device identity. This is designed to reduce site rework and redesign during expansion.

Confirm site conditions, deployment goals, rack power, network and operating boundaries.
Define the equipment list for 20HQ or 40HQ, air or liquid cooling, and project needs.
Integrate power, cooling, monitoring and interfaces; record agreed test results.
Deliver against the agreed transport, installation, connection and training plan.
PLATFORM LAYERS
Choose DracoPod air cooling or DracoArk liquid cooling in 20- or 40-foot formats according to site, rack power and cooling needs.
Connect power, cooling and environmental monitoring to view status and alerts in one place. Integration depends on the project.
For multi-site deployments, discuss unified management and workload scheduling. Scope is agreed per project.
Planned for device identity, resource and environmental telemetry, task execution, logs, offline buffering and fault isolation. Protocols, monitoring points and writable actions require confirmation through equipment supplier responses.
PRODUCT CATALOG
Hourly, committed-volume, dedicated-node and dedicated-cluster services are planned according to customer orders, node availability, network, licensing and contract conditions, with interfaces for metering and audit.
For multi-site deployments, discuss unified management and workload scheduling. Scope is agreed per project.
Planned capabilities include training, inference, fine-tuning, model versioning, vLLM / Triton inference gateways and API metering. Model, container image, data and software licenses are verified individually.
Co-development with ISVs for potential applications in manufacturing, energy, mining AI, industrial vision, drug discovery and government or enterprise knowledge bases, subject to pilots, responsibility boundaries and contracts.
DEPLOYMENT SCENARIOS
These are potential applications, not completed customer deployments. Implementation depends on data, networking, site conditions, model licensing and customer acceptance requirements.
A pod provides a plannable, transportable infrastructure envelope for projects that need a separate compute space. Site conditions require assessment.
Assess compute hosted in a pod or existing facility against data, network, model licensing and project requirements.
COMPANY QUALIFICATIONS
Longyu Zhishuan's own credentials and partner capabilities are presented separately, with ownership stated for each credential, result and reference.
The Longyu Zhishuan section is based on pages 24–27 of the company materials and is for general information. Certificate names, grades, scope and current validity are subject to the official certificates and competent authorities' public records.
STRATEGIC PARTNER · KEHUA DATA (002335)
Longyu Zhishuan has established a strategic relationship with Kehua Data. According to the materials, Kehua is the exclusive supplier of core power electronics and key infrastructure equipment for the compute pods; the companies collaborate on power, engineering integration and validation.
National high-tech enterprise; nationally recognized enterprise technology center; national industrial design center National green factory; postdoctoral research workstation National intelligent manufacturing exemplary scenario; manufacturing single-champion product (UPS) National innovation demonstration enterprise; service-oriented manufacturing demonstration enterprise; smart-PV pilot enterprise Green-design demonstration enterprise; key high-tech enterprise under the Torch Program Fujian Government Quality Award; Fujian smart-manufacturing pilot enterprise 2020 Second Prize, State Science and Technology Progress Award: key technologies and equipment for high-overload island/coastal power systems 2020 First Prize, Fujian Science and Technology Progress Award: operation control for large-scale battery storage First Prize for Technological Invention, Ministry of Education; provincial science awards; China Power Supply Society awards, among others
Science and technology programs: 10 key new products · 20 Torch Program projects · 2 national high-tech industry projects · 2 central-guided local projects Patent awards: 2 China Patent Awards · 3 Fujian Patent Awards · 7 municipal awards · 26 other provincial or ministerial science awards Green systems and catalogs: ISO 14001 · Green Star product certificate · green data-center technology catalog · telecom energy-saving catalog · RoHS / WEEE Industry and enterprise credentials: national and industry recognitions; see official company materials and certificates.
11 environmental test platforms: temperature, humidity, salt spray, high altitude, dust and water exposure. 10-meter electromagnetic compatibility facility: conducted and radiated emissions and immunity testing. Reliability testing: service-life aging, vibration and drop tests.
These facilities are described in the product materials; they do not mean every project has completed every test.
Power architecture: research into high-voltage DC isolation, solid-state transformers and next-generation data-center power. Cold-plate liquid cooling: pump optimization and coolant-temperature control for high-density cooling. Power-system integration: prefabricated power distribution and DC systems adapted to changing compute loads. Heterogeneous compute scheduling: a unified scheduler with domestic chip vendors to scale mixed-chip clusters on demand.
These are R&D directions in the materials, not claims of standard product availability.
The following projects and roles are listed in Kehua Data materials as examples of its industry experience. They are not Longyu Zhishuan delivery references or commitments from this site.
ICBC headquarters (Xisanqi): high-voltage DC power modules. China Mobile Nanjing Jiangbei: data-center project. Tencent Huailai Ruibei: prefabricated Block data-center solution. ABC headquarters: modular data center and rail-mounted robotic inspection. China Telecom Nanjing (Jishan): cloud computing center. Tencent Mini-Tblock: prefabricated container data center with high-voltage DC.
Agricultural Bank of China Inner Mongolia data center: phase one is approximately 120,000 m², including about 30,000 m² of data halls across six buildings; materials say Kehua contributed factory-prefabricated room systems. Everbright Securities technology operations disaster-recovery center: integrated power, cooling, micro-modules and facility monitoring.
Beijing Daxing International Airport: airport power assurance. Hong Kong–Zhuhai–Macau Bridge: power for critical bridge equipment. China–Brunei flagship cooperation project: energy infrastructure. Guangxi Fangchenggang Nuclear Power Station: nuclear-grade UPS. BRICS Xiamen Summit: power assurance for a major international event. Hangzhou 2022 Asian Games: micro-module data center; the source image shows the event emblem.
Grid-side storage test and demonstration project. China Resources Liyujiang: generation-side peak-shaving storage. Distributed grid-side energy storage. Taizhou, Jiangsu: user-side storage. Lingbi, Anhui: wind-farm paired storage. North American outdoor energy-storage converter.
This partner section is based on pages 28–39 of the product materials. Kehua Data (002335) credentials, awards, R&D directions and project references shown here are not Longyu Zhishuan credentials or delivery references. Names, figures, scope of participation and publication authorization must be confirmed against Kehua Data's current official materials and approval.
START A CONVERSATION
Tell us your site, compute scale and delivery goals. Our team can help you choose between DracoPod air cooling and DracoArk liquid cooling, and assess platform integration.